Thursday, February 12, 2009
Emergency Power House
We here at Casey station usually run our power from the Main Power house which contains 4 generator sets (2 of which run at any given time). Over summer an upgrade had to be done within the main power house that required us to run on the Emergency Power house for 2 weeks. Here in this photo is myself, Allen the other wintering sparky and Anthony one of 4 wintering diesel mechanics near engine number 1 (of 2) in the emergency power house. We had just done a small job on a temperature sensor on the engine.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment